项目基本情况:平板显视产业作为国家重点扶持产业,是列入国家“十二五”发展规划和“2006年至2020年信息产业中长期发展纲要”中最重要的发展项目之一。《电子信息产业调整和振兴规划》将发展LED产业列入重点任务和重大工程。该项目计划总投资15000万美元,占地面积400亩,总建筑面积70000平方米,所需员工500人,主要建设内容包括生产及辅助生产设施、动力设施、环保设施、安全设施、消防设施以及相应的建(构)筑物。项目建设期为2年,建筑工程费用750万美元,设备购置费用13500万美元,安装工程费用150万美元,其他工程费用600万美元,年实现销售收入10200万美元,年利润总额1100万美元。全部资金由企业自筹
Fundamental Information of Project: Flat Panel Display (FPD) industry, a an important industry supported by our country, serves as one of the most important development projects listed into the 12th Five-Year Plan and Middle and Long Term Development Outline for Information Industry from 2006 to 2020. According to Planning of Electronic Information Industry Restructuring and Revitalization, development of LED industry will be listed into major and critical projects. With total investment of USD150million, the Project covers an area of 400mu (266,666sqm) and a total construction area of 70,000sqm and employs a total staff of 500. The main construction includes facilities for production and auxiliary production, dynamic facilities, environment-friendly facilities, safety facilities, fire-fighting facilities and corresponding buildings. The construction time for the Project is 2 years, the cost for construction project is USD7.5million, and the cost for purchasing devices is USD135million, installation cost is USD1.5million, cost for other projects is USD6million. The annual sales income is USD102million, total annual profit is USD11million. All fund shall be collected by enterprises themselves.
建设条件:项目拟选址在承德张百湾新兴产业示范区内,该区交通便利,紧邻国道112线,距滦平县城10公里、京承高速滦平出口23公里,到北京仅1个半小时车程;京通铁路和正在建设的张唐铁路经过园区,并在区内设有客货两用站;水资源充沛,滦河流经27公里,径流量19立方米/秒;浅层地下水即可实现园区近期供水,规模为10万吨/日的供水厂正在建设中;区内现有35KV、110KV、220KV变电站各一座,承德西500KV变电站和园区专用35KV变电站即将建成投入使用;天然气管道在区内建设中转站一座、门站五个;现有处理能力为2万吨/日的污水处理厂一座,并可提供中水回用,规划建设处理能力为16万吨/日的第二污水处理厂1座,一期6万吨/日工程已开工建设。
Construction Conditions: the project is to be built in Zhangbaiwan New Industrial Demonstration Zone of Chengde. The location features convenient transportation and adjoins to No. 112 National Highway, 10km from Luanping County, 23km away from exits of Beijing-Chengde Highway and 1-hour drive away from Beijing. The Beijing-Tongliao Railway and the Zhangjiakou-Tangshan Railway which is being built pass through the Park. And stations for passenger and cargo trains are established in the zone. The water resources here is rich. And 27km of Luanhe passes here, with volume of runoff is 19 cubic meters per second. Shallow groundwater is enough to supply short-term water of the zone. And a water supply plant with a capacity of 100,000tons is being built. Now, there are three transformation stations with a capacity of 35KV, 110KV and 220KV separately. A transformation station of 500KV and the station of 35KV which is built especially for the zone are not being built for production. There is one transfer station and five gate stations, one sewage treatment plant with a capacity of 20,000tons/day to recycle water. And it is planned to build a sewage treatment plant with a daily capacity of 160,000tons. The first phase of this plant with a capacity of 60,000tons is finished.
项目进展情况:正在进行前期工作
Project Progress: initial work is in progress
合作方式:独资
Mode of Cooperation: single proprietorship